Solar Power

Solar Power

Evaluate your Money, Health and Next generation

Finance

Evaluate Your Money, Health, and the Next Generation!

Financial Matters
Matsa can assist in finding financing or investment partners for projects in the utilities sector.
Our commercial team has started negotiations with several European and Iranian financial partners to finance a 5 MW solar park in the Roshtkhar region.

Engineering

Matsa offers the following engineering services before and after the operational phase of photovoltaic (PV) projects. The efficiency of a PV system depends on the site location, structural design, and panel assembly. The structure can be fixed or equipped with a solar tracking system, available in single-axis and dual-axis types. Economically fixed systems are ideal for small PV installations, while solar tracking structures are better suited for solar parks. Our experienced engineers can design the best configuration based on your project requirements.

  • Pre-feasibility and feasibility studies
  • Site assessment
  • Weather analysis
  • Solar module positioning
  • Orientation and shading analysis
  • Module selection
  • Structural design and installation
  • PV electrical design
  • Electrical network design
  • Inverter configuration
  • Due diligence
  • Environmental impact assessments
  • Commissioning and installation
  • Operations and maintenance

 

Procurement

We supply equipment already used in projects by qualified Chinese, German, and European companies. Matsa can also provide spare parts for projects by other companies. Below are our procurement options:

  • Photovoltaic modules
  • Grid-connected inverters
  • Off-grid inverters
  • Batteries
  • Measurement and monitoring
  • equipment
  • Spare parts
  • Warranties

Construction

All required construction work at the factory site is handled by the Matsa Civil Team. The construction of a solar park includes a station and likely a low-voltage (LV) transmission line. According to the National Electrical Code, every standalone photovoltaic system must be grounded with a 24-volt (or higher) battery.

  • Construction work
  • Landscaping
  • Structural assembly
  • AC and DC wiring
  • Grounding
  • Construction of power supply stations
  • LV transmission line installation
  • Panel assembly
  • Installed PV systems are growing rapidly worldwide.

Thanks to technological advances, the cost of photovoltaic system equipment is decreasing.
Environmental policies in many countries provide both production-based and investment-based incentives.
Matsa works on both on-grid and off-grid systems, from small-scale to utility-scale solar projects.